Learn about our
Road Projects
Investment Plan Project

Before Implementation

After Implementation

After Laying Of Asphalt
The projects were implemented with a total of about 145 million pounds instead of 250 million pounds.
Reduced the execution period to 6 months using Arish Soilcem instead of 12 months.
Location
Kafr El-Sheikh
Investment Plan Project

During Implementation

After Implementation
20 million pounds have been provided with transfer facilities.
The route was carried out in a period of 3 weeks using Arish Soilcem instead of 6 months using the traditional way.
Location
Sakha , Kafr El-Sheikh
Taftish Sidi Salem Project

During Implementation

After Implementation
The project was implemented using Arish Soilcem.
Location
Sidi Salem , Kafr El-Sheikh
Aisha Sidi Salem Project

During Implementation

After Implementation
The project was implemented using Arish Soilcem.
Location
Sidi Salem , Kafr El-Sheikh
Ishaa Project

During Implementation

After Implementation
The project was implemented using Arish Soilcem.
Location
Ishaa , Kafr El-Sheikh
Roweina Project

During Implementation

After Implementation
The project was implemented using Arish Soilcem.
Location
Roweina , Kafr El-Sheikh
Sidi Ghazi Project

During Implementation

After Implementation
The project was implemented using Arish Soilcem.
Location
Sidi Ghazi , Kafr El-Sheikh
Team Focus Project Kamal Amer
AL –Zomor Canal

During Implementation

After Implementation
Providing transportation facilities and replacement work with a depth of 3.5 meters at a cost of 150 million pounds per kilometer length.
Saving 30 million pounds per 1 longitudinal kilometer.
Saving 50% of the execution time in the traditional way by using Arish Soilcem.
Location
Giza Governorate
Piling Platform in East Tafria Port Project

Before Implementation

After Implementation
Before Implementation : Natural soil before being treated and stabilized. As shown, the equipment is unable to move on weak soil.
After Implementation : Natural soil after being treated and stabilized using Arish Soilcem nanotechnology.
Location
Suez Canal
Gas Station Floor Project
Before Implementation
During Implementation

After Implementation
The project was implemented using Arish Soilcem.
Location
East of Tafreah
Internal Road Project

Before Implementation
During Implementation

After Implementation
The project was implemented using Arish Soilcem.
Location
Furniture Town , Damietta
Salhiya Al-Barani Project

During Implementation

After Implementation
Project implementation period was reduced by 3 months.
Saving 30 million pounds for each project cost by using Arish Soilcem.
Location
Fayoum
Establishing a Building Base in Al-Sawaqi Square
Before Implementation

During Implementation

After Implementation
Before Implementation: The water level was at a depth of 30 cm from the surface.
During Implementation: Improved Cement Layer 24 hours after implementation.
Location
Fayoum
Project Under The Coastal Bridge

Before Implementation

During Implementation

After Implementation
The project was implemented using Arish Soilcem.
Location
Alexandria
Shader Azzam Project-Port Said North Sinai Reconstruction Agency

During Implementation

After Implementation
Saving 60% of the project cost.
Saving 70% of the project implementation period Using Arish Soilcem.
Location
Port Said
Al-Samad-Aswan Road South Upper Egypt Reconstruction Authority

During Implementation

After Implementation

After Laying Of Asphalt
Saving 150 million pounds for transporting facilities and implementing works.
Implemented using Arish Soilcem.
Location
Aswan
Shaq Al-Thoban Project

During Implementation

After Implementation
The project was implemented using Arish Soilcem.
Location
Cairo
Red Sea Governorate Project Red Sea Reconstruction Authority - Gabal Elba

Before Implementation

During Implementation

After Implementation
Thickness Test
Road Was Hit By Flood
After Being Hit By Flood
The meter was executed at 190 pounds Using Arish Soilcem.
Location
Red Sea
Abu Al–Hassan El-Shazly Reconstruction Authority Marsa Alam

During Implementation

After Implementation

After Laying Asphalt
35% of the project implementation cost was saved.
50% of the project implementation period was saved using Arish Soilcem.
Location
Red Sea
Construction and Paving of Roads in New Valley Governorate New Valley Reconstruction Authority : Kharga City Roads

Before Implementation

During Implementation

After Implementation
The project was implemented using Arish Soilcem.
Location
New Valley
Construction and Paving of Roads in New Valley Governorate New Valley Reconstruction Authority : Dakhla City Roads

During Implementation

After Implementation
The project was implemented using Arish Soilcem.
Location
New Valley
Construction and Paving of Roads in New Valley Governorate New Valley Reconstruction Authority : Paris City Roads

Before Implementation

After Implementation
The project was implemented using Arish Soilcem.
Location
New Valley
Baron Palace Project

During Implementation

After Implementation
The project was implemented using Arish Soilcem.
Location
Cairo
Marsa Matrouh Governorate Northwest Coast Reconstruction Authority

During Implementation

After Implementation
35 million pounds were saved from the cost of implementing the project for the fourth, fifth and sixth sectors using Arish Soilcem.
Location
Marsa Matrouh
Western Province Reconstruction Authority of the North Central Coast – Hayah Karima

Before Implementation

After Implementation
The project was implemented using Arish Soilcem.
Location
Nahtay – Zefta
Gharbia Governorate
Nahtay Cornich Hayah Karima

Before Implementation

After Implementation (FDR)
The project was implemented using Arish Soilcem.
Location
Nahtay – Zefta
Gharbia Governorate
Western Province Reconstruction Authority of the North Central Coast – Hayah Karima

Before Implementation

During Implementation

After Implementation (FDR)
The project was implemented using Arish Soilcem.
Location
Tafahna Al Azab – Zefta
Gharbia Governorate
Assiut Governorate Central and Northern Upper Egypt Reconstruction Authority – Hayah Karima

During Implementation

After Implementation
The project was implemented using Arish Soilcem.
Location
Al-Zarabi Village
Abu Tig Center
Assiut Governorate
Damietta Governorate Central North Coast Reconstruction Authority – Hayah Karima

During Implementation

After Implementation
The project was implemented using Arish Soilcem.
Location
EL- Louzi Village
Damietta Governorate
Damietta Governorate Central North Coast Reconstruction Authority – Hayah Karima

During Implementation

After Implementation
The project was implemented using Arish Soilcem.
Location
Taftish Tani Village
Damietta Governorate
Sohag Governorate Third Field Army - Engineering Division – Hayah Karima

Before Implementation

After Implementation
The project was implemented using Arish Soilcem.
Location
Um Doma Village
Sohag Governorate
Beheira Governorate Northern Military District-Engineering Division – Hayah Karima

Before Implementation

After Implementation
The project was implemented using Arish Soilcem.
Location
AL-Abadia Center
Behaira Governorate
Beheira Governorate Northern Military District -Engineering Division – Hayah Karima

During Implementation

After Implementation
The project was implemented using Arish Soilcem.
Location
Berket Ghattas Village
Abo Humos Center
Behaira Governorate
Maasra Malawi Village Project

Before Implementation

After Implementation
The project was implemented using Arish Soilcem.
Location
Maasra Malawi Village
Minya Governorate
Markaz Al-Waqf Project

Before Implementation

After Implementation
The project was implemented using Arish Soilcem.
Location
Markaz Al-Waqf
Qena Governorate