Learn about our

Road Projects

Investment Plan Project

Before Implementation

After Implementation

After Laying Of Asphalt

The projects were implemented with a total of about 145 million pounds instead of 250 million pounds.
Reduced the execution period to 6 months using Arish Soilcem instead of 12 months.

Location

Kafr El-Sheikh

Investment Plan Project

During Implementation

After Implementation

20 million pounds have been provided with transfer facilities.
The route was carried out in a period of 3 weeks using Arish Soilcem instead of 6 months using the traditional way.

Location

Sakha , Kafr El-Sheikh

Taftish Sidi Salem Project

During Implementation

After Implementation

The project was implemented using Arish Soilcem.

Location

Sidi Salem , Kafr El-Sheikh

Aisha Sidi Salem Project

During Implementation

After Implementation

The project was implemented using Arish Soilcem.

Location

Sidi Salem , Kafr El-Sheikh

Ishaa Project

During Implementation

After Implementation

The project was implemented using Arish Soilcem.

Location

Ishaa , Kafr El-Sheikh

Roweina Project

During Implementation

After Implementation

The project was implemented using Arish Soilcem.

Location

Roweina , Kafr El-Sheikh

Sidi Ghazi Project

During Implementation

After Implementation

The project was implemented using Arish Soilcem.

Location

Sidi Ghazi , Kafr El-Sheikh

Team Focus Project Kamal Amer
AL –Zomor Canal

During Implementation

After Implementation

Providing transportation facilities and replacement work with a depth of 3.5 meters at a cost of 150 million pounds per kilometer length.
Saving 30 million pounds per 1 longitudinal kilometer.
Saving 50% of the execution time in the traditional way by using Arish Soilcem.

Location

Giza Governorate

Piling Platform in East Tafria Port Project

Before Implementation

After Implementation

Before Implementation : Natural soil before being treated and stabilized. As shown, the equipment is unable to move on weak soil.
After Implementation : Natural soil after being treated and stabilized using Arish Soilcem nanotechnology.

Location

Suez Canal

Gas Station Floor Project

Before Implementation

During Implementation

After Implementation

The project was implemented using Arish Soilcem.

Location

East of Tafreah

Internal Road Project

Before Implementation

During Implementation

After Implementation

The project was implemented using Arish Soilcem.

Location

Furniture Town , Damietta

Salhiya Al-Barani Project

During Implementation

After Implementation

Project implementation period was reduced by 3 months.
Saving 30 million pounds for each project cost by using Arish Soilcem.

Location

Fayoum

Establishing a Building Base in Al-Sawaqi Square

Before Implementation

During Implementation

After Implementation

Before Implementation: The water level was at a depth of 30 cm from the surface.
During Implementation: Improved Cement Layer 24 hours after implementation.

Location

Fayoum

Project Under The Coastal Bridge

Before Implementation

During Implementation

After Implementation

The project was implemented using Arish Soilcem.

Location

Alexandria

Shader Azzam Project-Port Said North Sinai Reconstruction Agency

During Implementation

After Implementation

Saving 60% of the project cost.
Saving 70% of the project implementation period Using Arish Soilcem.

Location

Port Said

Al-Samad-Aswan Road South Upper Egypt Reconstruction Authority

During Implementation

After Implementation

After Laying Of Asphalt

Saving 150 million pounds for transporting facilities and implementing works.
Implemented using Arish Soilcem.

Location

Aswan

Shaq Al-Thoban Project

During Implementation

After Implementation

The project was implemented using Arish Soilcem.

Location

Cairo

Red Sea Governorate Project Red Sea Reconstruction Authority - Gabal Elba

Before Implementation

During Implementation

After Implementation

Thickness Test

Road Was Hit By Flood

After Being Hit By Flood

The meter was executed at 190 pounds Using Arish Soilcem.

Location

Red Sea

Abu Al–Hassan El-Shazly Reconstruction Authority Marsa Alam

During Implementation

After Implementation

After Laying Asphalt

35% of the project implementation cost was saved.
50% of the project implementation period was saved using Arish Soilcem.

Location

Red Sea

Construction and Paving of Roads in New Valley Governorate New Valley Reconstruction Authority : Kharga City Roads

Before Implementation

During Implementation

After Implementation

The project was implemented using Arish Soilcem.

Location

New Valley

Construction and Paving of Roads in New Valley Governorate New Valley Reconstruction Authority : Dakhla City Roads

During Implementation

After Implementation

The project was implemented using Arish Soilcem.​

Location

New Valley

Construction and Paving of Roads in New Valley Governorate New Valley Reconstruction Authority : Paris City Roads

Before Implementation

After Implementation

The project was implemented using Arish Soilcem.​

Location

New Valley

Baron Palace Project

During Implementation

After Implementation

The project was implemented using Arish Soilcem.​

Location

Cairo

Marsa Matrouh Governorate Northwest Coast Reconstruction Authority

During Implementation

After Implementation

35 million pounds were saved from the cost of implementing the project for the fourth, fifth and sixth sectors using Arish Soilcem.

Location

Marsa Matrouh

Western Province Reconstruction Authority of the North Central Coast – Hayah Karima

Before Implementation

After Implementation

The project was implemented using Arish Soilcem.​

Location

Nahtay – Zefta
Gharbia Governorate

Nahtay Cornich Hayah Karima

Before Implementation

After Implementation (FDR)

The project was implemented using Arish Soilcem.​

Location

Nahtay – Zefta
Gharbia Governorate

Western Province Reconstruction Authority of the North Central Coast – Hayah Karima

Before Implementation

During Implementation

After Implementation (FDR)

The project was implemented using Arish Soilcem.

Location

Tafahna Al Azab – Zefta
Gharbia Governorate

Assiut Governorate Central and Northern Upper Egypt Reconstruction Authority – Hayah Karima

During Implementation

After Implementation

The project was implemented using Arish Soilcem.

Location

Al-Zarabi Village
Abu Tig Center
Assiut Governorate

Damietta Governorate Central North Coast Reconstruction Authority – Hayah Karima

During Implementation

After Implementation

The project was implemented using Arish Soilcem.

Location

EL- Louzi Village
Damietta Governorate

Damietta Governorate Central North Coast Reconstruction Authority – Hayah Karima

During Implementation

After Implementation

The project was implemented using Arish Soilcem.

Location

Taftish Tani Village
Damietta Governorate

Sohag Governorate Third Field Army - Engineering Division – Hayah Karima

Before Implementation

After Implementation

The project was implemented using Arish Soilcem.

Location

Um Doma Village
Sohag Governorate

Beheira Governorate Northern Military District-Engineering Division – Hayah Karima

Before Implementation

After Implementation

The project was implemented using Arish Soilcem.

Location

AL-Abadia Center
Behaira Governorate

Beheira Governorate Northern Military District -Engineering Division – Hayah Karima

During Implementation

After Implementation

The project was implemented using Arish Soilcem.

Location

Berket Ghattas Village
Abo Humos Center
Behaira Governorate

Maasra Malawi Village Project

Before Implementation

After Implementation

The project was implemented using Arish Soilcem.

Location

Maasra Malawi Village
Minya Governorate

Markaz Al-Waqf Project

Before Implementation

After Implementation

The project was implemented using Arish Soilcem.

Location

Markaz Al-Waqf
Qena Governorate